Czech Republic
Three photovoltaic plants with a total capacity of 10 MWp at sites in Struhařov, Světlá and Vernéřov.
Photovoltaic Plant Struhařov
In December 2009, the photovoltaic plant in Struhařov was put into operation with an installed power of 2 MWp.
Photovoltaic Plant Světlá
The photovoltaic plant in Světlá was put into operation at the end of October 2010 with an installed power of 4 MWp.
Photovoltaic Plant Vernéřov
In the middle of December 2010, the photovoltaic plant in Vernéřov was put into operation with an installed power of 4 MWp.
Photovoltaic Plant Struhařov
In December 2009, the photovoltaic plant in Struhařov was put into operation with an installed power of 2 MWp.
Photovoltaic Plant Světlá
The photovoltaic plant in Světlá was put into operation at the end of October 2010 with an installed power of 4 MWp.
Photovoltaic Plant Vernéřov
In the middle of December 2010, the photovoltaic plant in Vernéřov was put into operation with an installed power of 4 MWp.