Sweden
Wind park Laxåskogen in Sweden was put into operation in January 2019.
Wind Park Laxåskogen
The wind park Laxåskogen was put into operation in January 2019 and consists of 7 turbines with a total installed power of 25 MW.
Wind Park Laxåskogen
The wind park Laxåskogen was put into operation in January 2019 and consists of 7 turbines with a total installed power of 25 MW.